ConcreteGauge

ConcreteGauge / Deck footing

Deck footing concrete calculator

Enter the pier size and height, add a pad if your footing has a wider base, and say how many footings the deck has.

The inside diameter of the tube form, or of the hole if you pour straight into it.

From the bottom of the pier to its top, including the part above ground.

A wider base that spreads the load. Leave 0 for a straight pier.

Bag size
More options: extra for waste, prices

These are example prices. Change them to what your store and supplier charge.

What to buy

2.59 cubic feet

0.1 cubic yards, or 0.073 cubic metres. Includes 10% extra for spills and uneven ground. Without it: 2.36 cubic feet.

Mix it from bags

5 bags of 80 lb

About $32.50. That is 400 lb to carry and mix.

Best for this job: under one cubic yard, bags are simpler than a delivery.

Bags needed, by bag size
40 lb bags9
50 lb bags7
60 lb bags6
80 lb bags5

The concrete weighs about 389 lb once poured.

12 in36 in

How to measure a deck footing

  1. The pier diameter is the inside of the tube form. If you pour straight into an augered hole, it is the hole.
  2. The pier height runs from its bottom to its top, including the few inches that stand above the ground.
  3. If the plans show a wider square pad under the pier, enter its side and its thickness. The pier height then starts at the top of the pad.
  4. Enter the number of footings. Count the ones under the beam and any under stair landings.

The formula

Pier: 3.1416 × radius × radius × height. Pad: side × side × thickness. Add the two, then multiply by the number of footings.

For a 12 inch pier 36 inches tall:

  • 3.1416 × 0.5 × 0.5 × 3 = 2.36 cubic feet
  • Add 10%: 2.59 cubic feet, or 5 bags of 80 lb

With a pad 24 inches square and 8 inches thick under it, the footing takes 5.02 cubic feet: the pad more than doubles the concrete. Six plain piers of this size come to 15.55 cubic feet, or 26 bags of 80 lb.

Concrete per pier

Cubic feet to buy and bags of 80 lb for one straight pier, with 10% extra already added.

Pier24 in tall36 in tall48 in tall
8 in pier0.77 cu ft · 21.15 cu ft · 21.54 cu ft · 3
10 in pier1.20 cu ft · 21.80 cu ft · 32.40 cu ft · 4
12 in pier1.73 cu ft · 32.59 cu ft · 53.46 cu ft · 6
16 in pier3.07 cu ft · 64.61 cu ft · 86.14 cu ft · 11
18 in pier3.89 cu ft · 75.83 cu ft · 107.78 cu ft · 13

How big and how deep?

For decks, the International Residential Code sizes each footing from a table, by how much deck it holds up and how firm the soil is, and it requires the footing to sit at least 12 inches below undisturbed ground. Where a deck is attached to a house in a place with frost, the footings must also be protected from it, most often by going below the local frost line.

In practice your building department gives you three numbers: the footing size, the depth, and whether you need a pad. Enter those here. A deck that is too small to need a permit still benefits from the same sizes.

Pour each footing in one go

Have all the bags for a footing beside it before you start, and set the post bracket while the concrete is fresh. If the hole is wider than the tube, backfill round the tube with soil rather than concrete, or enter the hole’s diameter instead and expect to use more.

A fence is a different job, with the post standing in the concrete: use the fence post calculator. For taller formed columns above ground, see the column calculator.

Questions people ask

How many bags of concrete do I need for a deck footing?

A 12 inch pier 36 inches tall needs 5 bags of 80 lb including 10% extra. A 10 inch pier of the same height needs 3, and an 8 inch pier 2.

How much concrete for a 12 inch tube 4 feet deep?

3.46 cu ft to buy, which is 6 bags of 80 lb, including 10% extra.

How deep do deck footings need to be?

Under the International Residential Code, at least 12 inches below undisturbed ground. Where frost applies and the deck is attached to the house, they must also be frost-protected, usually by going below the local frost line. Your building department sets the depth.

What size should a deck footing be?

It depends on the area of deck each footing carries, the snow and live load, and the soil. The International Residential Code gives the sizes in a table, and your building department will tell you which row applies.

Do I need a pad under the pier?

Only if your plans or inspector call for one. A pad spreads the load over more soil. When there is one, it often holds more concrete than the pier, so include it.

Where the numbers come from

  • Deck footing size, depth and frost protection: International Residential Code R507.3, as set out in the Town of Easton deck packet (2021 IRC). Your local code may differ.
  • Bag yields: a 40 lb bag makes about 0.3 cubic feet, 50 lb about 0.375, 60 lb about 0.45 and 80 lb about 0.6 (ArcSite, Concrete Network). Brands differ a little, so check the yield printed on your bag.
  • Bag yields outside the United States: in the United Kingdom and Ireland a 20 kg bag makes about 0.01 cubic metres (Blue Circle, at Travis Perkins); in Australia and New Zealand 108 bags of 20 kg make a cubic metre (Boral); in Canada a 30 kg bag makes about 0.44 cubic feet (Quikrete, at Home Depot Canada). The 25 kg figures are worked out in proportion.
  • Weight: 150 lb per cubic foot for normal concrete (Omni Calculator).

Every formula on this page is checked by an automatic test each time the site is updated. Last reviewed 15 November 2026.

What you may need next