ConcreteGauge

ConcreteGauge / Wall

Concrete wall calculator

Enter the length, height and thickness of a poured concrete wall to see how many cubic yards the forms will take.

Bag size
More options: several walls, extra for waste, prices

These are example prices. Change them to what your store and supplier charge.

What to buy

2.17 cubic yards

58.67 cubic feet, or 1.66 cubic metres. Includes 10% extra for spills and uneven ground. Without it: 1.98 cubic yards.

Mix it from bags

98 bags of 80 lb

About $637.00. That is 7,840 lb to carry and mix.

Order ready-mix

2.25 cubic yards

About $337.50 before delivery fees. Rounded up to the next quarter yard, the way suppliers sell it.

Best for this job: over one cubic yard, a truck saves a lot of mixing.

Bags needed, by bag size
40 lb bags196
50 lb bags157
60 lb bags131
80 lb bags98

The concrete weighs about 8,800 lb once poured.

20 ft4 ft8 in thick

How to measure a wall

  1. Measure the length along the middle of the wall. For walls that meet at a corner, measure one wall to the outside of the corner and the other to the inside, so the corner is counted once.
  2. Measure the height from the top of the footing to the top of the wall.
  3. Measure the thickness between the inside faces of the forms.
  4. For several walls of the same size, open “More options” and enter how many.

The formula

Length × height × thickness, all in feet, then divide by 27 for cubic yards.

For a wall 20 feet long, 4 feet high and 8 inches thick:

  • 8 inches ÷ 12 = 0.667 feet
  • 20 × 4 × 0.667 = 53.33 cubic feet, or 1.98 cubic yards
  • Add 10%: 2.17 cubic yards, ordered as 2.25 yards of ready-mix

Concrete per 10 feet of wall

Cubic yards to buy for each 10 feet of wall length, with 10% extra already added.

Wall4 ft high8 ft high
6 in thick0.811.63
8 in thick1.092.17
10 in thick1.362.72
12 in thick1.633.26

Doors, windows and stepped walls

Work out the wall as if it were solid, then work out each opening as a small wall of its own and subtract it. A doorway 3 feet wide and 7 feet high in an 8 inch wall saves 14 cubic feet, about 0.52 cubic yards.

For a wall that steps down a slope, treat each step as its own wall and add them. For a wall that tapers, thicker at the bottom than the top, enter the average of the two thicknesses.

Pour a wall in one go

A wall is poured into closed forms, so you cannot see a shortfall until the concrete stops rising. Order the full amount with the extra included, and tell the supplier it is a wall pour so the truck is loaded to match.

Walls of any real height hold back soil or carry a building, and their thickness and steel are set by code or by an engineer. This page works out the volume once those are decided.

A wall built from concrete blocks is a different job with different maths: see the concrete block calculator. The footing under the wall has its own page: the footing calculator.

Questions people ask

How much concrete do I need for a 20 foot wall?

A wall 20 feet long, 4 feet high and 8 inches thick takes 1.98 cubic yards. With 10% extra, buy 2.17 cubic yards.

How many yards of concrete are in an 8 foot wall?

Each 10 feet of wall 8 feet high takes 2.17 cubic yards at 8 inches thick and 2.72 cubic yards at 10 inches thick, with 10% extra included.

Do I subtract windows and doors?

Yes, if they are formed as openings in the pour. Work out each opening as width × height × wall thickness and take it off the total. Small openings are often ignored and treated as part of the extra.

Can I pour a wall from bags?

Only a small one. The 20 foot example on this page is 98 bags of 80 lb, and a wall should rise in one continuous pour. Above about one cubic yard, order ready-mix.

Does this include the footing?

No. The footing is wider than the wall and is poured first. Work it out separately and add the two answers if you are ordering both together.

Where the numbers come from

  • The volume of a rectangular wall (length × height × thickness) is standard geometry. No code figures are used on this page.
  • Bag yields: a 40 lb bag makes about 0.3 cubic feet, 50 lb about 0.375, 60 lb about 0.45 and 80 lb about 0.6 (ArcSite, Concrete Network). Brands differ a little, so check the yield printed on your bag.
  • Bag yields outside the United States: in the United Kingdom and Ireland a 20 kg bag makes about 0.01 cubic metres (Blue Circle, at Travis Perkins); in Australia and New Zealand 108 bags of 20 kg make a cubic metre (Boral); in Canada a 30 kg bag makes about 0.44 cubic feet (Quikrete, at Home Depot Canada). The 25 kg figures are worked out in proportion.
  • Weight: 150 lb per cubic foot for normal concrete (Omni Calculator).

Every formula on this page is checked by an automatic test each time the site is updated. Last reviewed 15 November 2026.

What you may need next