ConcreteGauge / Steps
Concrete steps calculator
Enter how many steps you are pouring and the size of one step. Add a landing if there is a platform at the top.
What to buy
14.12 cubic feet
0.52 cubic yards, or 0.4 cubic metres. Includes 10% extra for spills and uneven ground. Without it: 12.83 cubic feet.
Mix it from bags
24 bags of 80 lb
About $156.00. That is 1,920 lb to carry and mix.
Best for this job: under one cubic yard, bags are simpler than a delivery.
Order ready-mix
0.75 cubic yards
About $112.50 before delivery fees. Rounded up to the next quarter yard, the way suppliers sell it.
| 40 lb bags | 48 |
|---|---|
| 50 lb bags | 38 |
| 60 lb bags | 32 |
| 80 lb bags | 24 |
The concrete weighs about 2,118 lb once poured.
How to measure steps
- Count the steps, including the top one if it is poured with the rest.
- Measure the rise: the height of one step. To plan new steps, divide the total height you need to climb by the number of steps.
- Measure the run: the depth of one step from front to back.
- Measure the width across the steps.
- If the top is a platform deeper than one step, enter the extra depth as the landing. Leave it at 0 if there is none.
The formula
Solid steps are a stack of slabs. The bottom step lies under every step above it, so it is as long as all the runs together; the next is one run shorter, and so on.
Width × rise × run × (1 + 2 + … + number of steps), plus width × landing depth × total height.
For 3 steps with a 7 inch rise and an 11 inch run, 4 feet wide:
- 1 + 2 + 3 = 6 blocks, each 7 × 11 inches in section
- 4 × 0.583 × 0.917 × 6 = 12.83 cubic feet
- Add 10%: 14.12 cubic feet, or 24 bags of 80 lb
A landing 3 feet deep at the top of the same steps is a block 4 feet wide, 3 feet deep and 21 inches high. With it, the total to buy is 37.22 cubic feet, or 1.38 cubic yards.
Concrete by number of steps
For steps with a 7 inch rise and an 11 inch run and no landing, 10% extra already added.
| Steps | Total height | 3 ft wide | 4 ft wide | ||
|---|---|---|---|---|---|
| Cubic feet | 80 lb bags | Cubic feet | 80 lb bags | ||
| 1 step | 7 in | 1.76 | 3 | 2.35 | 4 |
| 2 steps | 14 in | 5.29 | 9 | 7.06 | 12 |
| 3 steps | 21 in | 10.59 | 18 | 14.12 | 24 |
| 4 steps | 28 in | 17.65 | 30 | 23.53 | 40 |
| 5 steps | 35 in | 26.47 | 45 | 35.29 | 59 |
| 6 steps | 42 in | 37.06 | 62 | 49.41 | 83 |
The amount grows quickly: six steps take more than twice the concrete of four, because every extra step sits on top of a longer base.
Rise and run that pass inspection
For homes, the International Residential Code limits each riser to 7¾ inches at most and each tread to 10 inches at least, and the tallest and shortest riser in one flight may differ by no more than ⅜ inch. Many places adopt it with changes, so confirm the figures with your building department.
Because the steps must match, divide the total height evenly. A climb of 21 inches is three risers of 7 inches, not two of 7¾ and a short one.
Solid or filled?
This page assumes the steps are solid concrete from the ground up. Large sets of steps are often built over compacted fill or blocks, with concrete only on the outside, and use much less. If yours are filled, work out the solid volume here and take off the volume of the fill.
A path or pad at the bottom of the steps is a slab. A slope instead of steps is on the ramp calculator.
Questions people ask
How much concrete do I need for 3 steps?
Three solid steps with a 7 inch rise and an 11 inch run take 10.59 cubic feet at 3 feet wide and 14.12 cubic feet at 4 feet wide, including 10% extra. That is 18 or 24 bags of 80 lb.
How many bags of concrete for 4 steps?
Four steps 4 feet wide, with a 7 inch rise and an 11 inch run, need 40 bags of 80 lb including 10% extra. At 3 feet wide they need 30.
What is the formula for concrete steps?
Multiply the width by the rise by the run, then by the sum of the step numbers (1 + 2 + 3 for three steps). Add the landing, if there is one, as a block: width × landing depth × total height.
How high can a concrete step be?
The International Residential Code sets a maximum riser of 7¾ inches and a minimum tread of 10 inches for homes. Local codes can differ, so check before you build the forms.
Does the calculator include the landing?
Yes, when you enter a landing depth. It is counted as a solid block as wide as the steps and as tall as the whole flight. Leave the box at 0 for steps with no platform.
Where the numbers come from
- Riser and tread limits: International Residential Code R311.7.5, as set out in this City of Boise code handout. Your local code may differ.
- Bag yields: a 40 lb bag makes about 0.3 cubic feet, 50 lb about 0.375, 60 lb about 0.45 and 80 lb about 0.6 (ArcSite, Concrete Network). Brands differ a little, so check the yield printed on your bag.
- Bag yields outside the United States: in the United Kingdom and Ireland a 20 kg bag makes about 0.01 cubic metres (Blue Circle, at Travis Perkins); in Australia and New Zealand 108 bags of 20 kg make a cubic metre (Boral); in Canada a 30 kg bag makes about 0.44 cubic feet (Quikrete, at Home Depot Canada). The 25 kg figures are worked out in proportion.
- Weight: 150 lb per cubic foot for normal concrete (Omni Calculator).
Every formula on this page is checked by an automatic test each time the site is updated. Last reviewed 15 November 2026.